Visitor Tips

Downtown Events & Promotions

Shopping, Dining, Entertainment & Hotel Deals

Business Directory

Retail Store Listings

Restaurant Listings

Hotel Listings

Attractions, Sports & Entertainment Venue Listings

Downtown Neighborhoods

Getting Around

Home: Business Resources

Economic Info

Development Guide

Business Events Calendar

Member Directory

Committee Schedule

Board Minutes

Committee Notes

Archives

Board Packet

Member-to-member promotions

DSA Programs

Metropolitan Improvement District

Downtown Seattle Cares

Issues & Advocacy

Business Development & Market Research

Commute Seattle

Our Events

About Us

Membership Info

Annual Report

Goals and Priorities

DSA Newsroom

Committees

Board of Trustees

Staff

Employment Opportunities

Sponsorship Opportunities

Downtown Seattle
   
 
businesses image

Downtown Development Guide

 

Home: Business Resources
Economic Info
Development Guide
Development Projects
Development Map


Print this page

Email this page

Use the search options below to sort development projects by status, category and neighborhood. Click "Check all" to view all projects.

Step one - Search by Project Name:

Project Name / Address:
 


 
Step two - Search by Project Status: (Check all | Uncheck all)
Planned, Permitted and Scheduled Currently Under Construction Completed
Click here for more search options



Go to category: | Biotech/Medical | Cultural | Government | Hotel/Residential | Industrial | Office | Office/Residential | Residential | Retail | Transportation |

Biotech/Medical

Virginia Mason Medical Center (expansion)
Currently Under Construction
1100 9th Ave
West side of Boren between Spring Street and Seneca Street
Virginia Mason Medical Center is expanding their facilities at a site east of the existing medical center along Seneca Street. This approximately 250,000 square-foot addition will include a lobby, utility plant, a procedure and operating room floor, an acute care floor and a critical care floor.

Developer: Virginia Mason Medical Center
Cost: $142,000,000
Neighborhood: First Hill
Opening: 2Q 2010
DPD #: 2302041
Category: Biotech/Medical

Back to topBack to top

Cultural

First United Methodist Church and Community Center
Currently Under Construction
168 Denny Way
North side of Denny Way between Warren Ave N and 2nd Ave N
A 26,400 square-foot church and 7,280 square-foot community center will be constructed as the future home of Seattle's First United Methodist Church. Includes classroom spaces and four levels of above-grade parking. With a capacity for 450, the new church will be smaller than their former home at 5th and Marion. The community center will be used as an overnight shelter and drop-in center.

Developer: First United Methodist Church
Cost: $34,000,000
Neighborhood: Uptown
Opening: TBA
DPD #: 3008097 and 3007719
Category: Cultural
Parking: 141
Lake Union Park
Currently Under Construction
860 Terry Ave N
NE corner of Westlake Ave and Valley St
The 12-acre park project includes replacing the seawall bulkhead and building a boardwalk that follows the seawall, along with a pedestrian bridge and utility improvements. The project also includes landscaping, construction of an interactive water fountain, expansion of the Center for Wooden Boats, and a pond for racing model boats. In addition, there will be a trail focusing on the lake's industrial history.

Developer: Seattle Parks Foundation
Cost: $29,600,000
Neighborhood: South Lake Union
Opening: 2010
DPD #: 3003318
Category: Cultural
Washington State Convention Center (Expansion)
Currently Under Construction
800 Convention Place
7th Ave and Pike St
This renovation will add approximately 50,000 square feet of convention space in 2010.

note: there is also a $776 million proposed Convention Center expansion on the site of Metro King County's Convention Place Station.

Developer: Washington State Convention and Trade Center
Cost: $23,150,000
Neighborhood: Retail Core
Opening: 2010
DPD #: 6065031
Category: Cultural

Back to topBack to top

Government

Henry M. Jackson Federal Building (renovation)
Completed : 1Q 2009
901 1st Ave
NE corner of 1st Ave and Marion St
The 36-story high-rise, built in 1974 and occupied by the federal government, received various improvements. These included seismic upgrades, elevator and mechanical system upgrades and ADA improvements to the restrooms.

Developer: Howard S Wright Construction
Cost: $36,000,000
Neighborhood: Retail Core
Opening: 1Q 2009
Category: Government

Back to topBack to top

Hotel/Residential

2000 Third Avenue Apartments
Planned, Permitted and Scheduled
2000 3rd Ave
NE corner of 3rd Ave and Virginia St
The developer is seeking to build a 42-story structure with 421 apartment units, 40 hotel units, 5,131 square feet of retail and 364 parking stalls.

Developer: Tarragon Development
Cost: $75,000,000
Neighborhood: Belltown
Opening: TBA
DPD #: 3003187
Category: Hotel/Residential
Rooms: 40
Units: 421
Parking: 364
Alaska Building - Marriott
Currently Under Construction
612 2nd Ave
2nd Ave & Cherry St
This building is being changed from existing office space to hotel, apartment and retail. The building will have a 3,667 square foot restaraunt, ground-floor retail, 26 apartments and a 250 room hotel. Project includes a 37,377-square-foot addition to existing structure.

Developer: Kauri Investments Ltd / Ariel Development
Cost: $35,000,000
Neighborhood: Retail Core
Opening: TBA
DPD #: 3005085
Category: Hotel/Residential
Rooms: 250
Units: 26
Hyatt Place Seattle / 6th & Denny Apartments
Currently Under Construction
600 Denny Way
6th Ave and Denny Way
The Hyatt Place Seattle will have 158 hotel suites and 56 apartments. The developer, 6th and Denny LLC, is a joint venture between Kauri Investments, Ariel Development and partner Gary Fulcrum. Unlike hotels with residential units stacked above, Hyatt Place will have two buildings, each with separate entries and hallways. The hotel will be eight stories and the residential building will be six. Both sections were designed by Johnson Braund Design Group of Seattle.

Developer: 6th and Denny, LLC
Cost: $60,000,000
Neighborhood: South Lake Union
Opening: TBA
DPD #: 3004044
Category: Hotel/Residential
Rooms: 158
Units: 56
Parking: 253
Olive 8
Completed : 1Q 2009
1635 8th Ave
SW corner of 8th Ave and Olive Way
R.C. Hedreen recently completed a 35-story hotel-condominium at the southwest corner of 8th Ave and Olive Way. The project includes 231 condominium units, 349 hotel rooms and 16,828 square feet of retail space as well as a spa and fitness center. There is underground parking for 342 vehicles. This project has received LEED certification. The hotel is called Hyatt at Olive 8.

Developer: R.C. Hedreen
Cost: $150,000,000
Neighborhood: Denny Triangle
Opening: 1Q 2009
DPD #: 2402418
Category: Hotel/Residential
Rooms: 349
Units: 231
Parking: 342

Back to topBack to top

Industrial

1531 Utah Ave S
Currently Under Construction
1531 Utah Ave S
Utah Ave S and S Massachusetts
This project consists of a six story building with retail and a restaurant on the ground floor (10,031 sq. ft.) and spaces for light manufacturing (47,810 sq. ft.), offices (50,000 sq. ft.) and non-household sales & services (47,809 sq. ft.) above. Parking for 256 vehicles will be provided within the structure.

Developer: 1531 Utah Ave S LLP
Cost: $31,000,000
Neighborhood: SoDo
Opening: 1Q 2010
DPD #: 3007730
Category: Industrial
Holgate Square
Planned, Permitted and Scheduled
1770 Airport Way S
Corner of Holgate and Airport Way S
Four industrial/retail buildings on Airport Way South and South Holgate Street. Two will be 3,200 square feet, one will be 5,000 square feet and another will be 15,200 square feet. All buildings will be premanufactured and are expected to be completed by early 2010.

Developer: Puget Properties LLC
Neighborhood: Denny Triangle
Opening: 1Q 2010
DPD #: 6137189
Category: Industrial
Seattle Steam Company
Completed : 2Q 2009
1318 Western Ave
Western Ave between University and Union St
Seattle Steam recently completed construction of one 12,800 square-foot two-story utility structure at 1318 Western Avenue and a 1,260 square-foot addition to a facility at 1319 Western Avenue including installation of a 200-foot smokestack. These new facilities introduce biomass into Seattle Steam's fuel mix.

Developer: Seattle Steam Company
Cost: $2,750,000
Neighborhood: Retail Core
Opening: 2Q 2009
DPD #: 3003528
Category: Industrial

Back to topBack to top

Office

1918 Eighth
Completed : 4Q 2009
1918 8th Ave
NE corner of 8th Ave and Stewart St
The project is a 34-story building with 660,000 square feet of office and 6,363 square feet of ground floor retail. Eight levels of below grade parking for 584 vehicles.

Developer: Schnitzer West
Cost: $120,600,000
Neighborhood: Denny Triangle
Opening: 4Q 2009
DPD #: 3004017
Category: Office
Parking: 584
500 Yale
Completed : 3Q 2009
500 Yale Ave N
Yale Ave N and Republican St
A five-story building containing 2,700 square-feet of retail at ground level and 70,000 square-feet of office on four floors above. Parking for 139 vehicles provided.

Developer: Weiss / Jenkins Properties
Cost: $22,400,000
Neighborhood: South Lake Union
Opening: 3Q 2009
DPD #: 3005413
Category: Office
Parking: 139
505 First Avenue South
Currently Under Construction
505 1st Ave S
West side of 1st Ave S, north of Hwy 99 ramp
This office project is being developed by Starbucks and will be available for lease when completed in April 2010. The total project is approximately $100,000,000 and contains about 300,000 square feet of class A office space with 4 levels of underground parking.

Developer: Starbucks
Cost: $100,000,000
Neighborhood: Pioneer Square
Opening: 2Q 2010
DPD #: 3005586
Category: Office
Parking: 129
635 Elliott Ave W
Currently Under Construction
635 Elliott Ave W
W side of Elliott just S of Mercer
The project calls for the construction of two four-story administrative office buildings (138,891 square feet and 183,083 square feet) with parking for 520 vehicles located in below grade garage.

Developer: Martin Selig Real Estate
Cost: $66,000,000
Neighborhood: Uptown
Opening: TBA
DPD #: 3005262
Category: Office
Parking: 520
7th and Madison
Completed : 1Q 2009
904 7th Ave
7th and Madison
A nine-story office building with 201,000 square feet of office space developed by Opus Northwest. The project is surrounded by retail amenities as well as a courtyard with a water feature and landscaping. NBBJ was the design architect.

Developer: Opus Northwest LLC
Cost: $23,500,000
Neighborhood: First Hill
Opening: 1Q 2009
DPD #: 6110136
Category: Office
Amazon.com Campus - Phase IA
Currently Under Construction
535 Terry Ave N
NW corner of Terry Ave and Republican St
As part of the first phase of Vulcan's Amazon.com Project, this 4-story administrative office building will have 114,000 square feet of office space and 1,600 square feet of retail.

Developer: Schnitzer West and Vulcan Inc
Cost: $99,000,000
Neighborhood: South Lake Union
Opening: 2Q 2010
DPD #: 6070665
Category: Office
Parking: 129
Amazon.com Campus - Phase IB
Currently Under Construction
410 Terry Ave N
NE Corner of Terry Ave N and Harrison St
This phase of Vulcan's Amazon.com project will consist of two buildings with 315,500 square feet of office and 10,250 square feet of retail space.

Developer: Schnitzer West and Vulcan Inc
Cost: $58,000,000
Neighborhood: South Lake Union
Opening: 2Q 2010
DPD #: 3005096
Category: Office
Parking: 725
Amazon.com Campus - Phase II
Currently Under Construction
1100 Republican St
On East side of Boren Ave between Republican and Mercer
Phase II of the new Amazon.com campus in South Lake Union will have approximately 155,000 square feet of office space and 14,000 square feet of retail.

Developer: Vulcan Inc.
Cost: $55,200,000
Neighborhood: South Lake Union
Opening: 3Q 2010
DPD #: 3007493
Category: Office
Parking: 363
Amazon.com Campus - Phase III
Currently Under Construction
1001 Mercer St
Mercer St and Terry Ave N
Phase III of the Amazon.com campus project in South Lake Union consists of two buildings with 236,000 square feet of office and 39,000 square feet of retail.

Developer: Vulcan, Inc.
Cost: $58,200,000
Neighborhood: South Lake Union
Opening: 1Q 2011
DPD #: 3007492
Category: Office
Parking: 287
Amazon.com Campus - Phase IV
Currently Under Construction
333 Boren Ave N
between Harrison and Thomas and Terry and Boren
Phase IV of Vulcan's Amazon.com Project will consist of 486,000 square feet of office and 30,000 square feet of retail in up to three buildings. Planning for LEED Silver or better.

Developer: Vulcan Inc.
Cost: $124,000,000
Neighborhood: South Lake Union
Opening: 2Q 2011
DPD #: 3008521
Category: Office
Amazon.com Campus - Phase V
Currently Under Construction
201 Boren Ave N
On Boren between John and Thomas
This last phase of Vulcan's Terry-Boren Project will consist of one 11-story building with 330,000 square feet of office and 5,000 square feet of retail. Planning for LEED Silver or better.

Developer: Vulcan Inc.
Cost: $80,000,000
Neighborhood: South Lake Union
Opening: 3Q 2011
DPD #: 3008520
Category: Office
Bill and Melinda Gates Foundation Campus
Currently Under Construction
500 5th Ave N
SE Corner of Mercer St and 5th Ave N
Construction of a multi-phase office campus of up to one million square feet for the Bill and Melinda Gates Foundation, with parking for about 1,950 vehicles. When completed, the campus will include 900,000 square feet, enough to house up to 1,200 employees.

Developer: The Seneca Group
Cost: $500,000,000
Neighborhood: Uptown
Opening: 4Q 2010
DPD #: 3003599
Category: Office
Parking: 700
Fifth & Columbia Office Tower
Planned, Permitted and Scheduled
811 5th Ave
811 5th AVE
The 5th and Columbia Tower will be a 43 story building with 700,000 square feet of office space. When completed it will be the 5th tallest building in Seattle at 660 feet. This project is being developed by Nitze-Stagen and Daniels Development Company is being built toward LEED Gold standards. Next door on the same site, the historic First United Methodist Church sanctuary is being preserved.

Developer: Nitze-Stagen and Daniels Development Company
Cost: $300,000,000
Neighborhood: Retail Core
Opening: TBA
DPD #: 3007582
Category: Office
Parking: 290
Fifth and Yesler Office Building
Completed : 2009
300 5th Ave
NE corner of 5th Ave and Yesler Way
Martin Selig completed the 17-story 5th & Yesler office tower in 2009. This building claims the largest elevator core in the continental United States and the largest retaining wall in Seattle. The building is 420,000 square feet (gross) with parking for 210 and 275,000 square feet of office space. Built toward LEED Gold.

Developer: Martin Selig Real Estate
Cost: $60,000,000
Neighborhood: Retail Core
Opening: 2009
DPD #: 9900477
Category: Office
Parking: 210
Joshua Green Building Renovation
Completed : 3Q 2009
1425 Fourth Ave
W side of 4th Ave near Union St
Built in 1910, this historic 10-story building underwent seismic upgrades and reconfiguration of its interior for larger tenant spaces including 22,000 square-feet of retail and 56,300 square-feet of office space.

Developer: Joshua Green Corporation
Cost: $18,600,000
Neighborhood: Retail Core
Opening: 3Q 2009
DPD #: 6155632
Category: Office
Pacific Commercial Building
Currently Under Construction
240 2nd Ave S and 220 S Main St
2nd Avenu S and S Main St
ConoverBond Development is reconstructing two top floors of both the Furuya and Corgiat buildings and performing seismic upgrades and other building renovations. When completed, both buildings will have ground floor retail space and office space above. A below-grade restaurant facility is also planned for this site. Project will add approximately 12,600 square feet of office space to existing building.

Developer: ConoverBond Development
Cost: $9,000,000
Neighborhood: Pioneer Square
Opening: TBA
DPD #: 3008106
Category: Office
Palmer Court Building
Completed : 2Q 2009
1000 1st Ave S
Between 1st S and Occidental S
This new renovation will create a six story structure with 10,100 square feet of retail at street-level and 55,000 square feet of office space above. The structure for the Palmer building will remain while the adjoining Mac's Smokehouse structure will be demolished.

Developer: Kauri Investments, American Life, Ariel Development
Cost: $3,600,000
Neighborhood: Pioneer Square
Opening: 2Q 2009
DPD #: 3007580 / 3008916
Category: Office
Parking: 19
West 8th
Completed : 1Q 2009
2001 8th Ave
8th Ave, Virginia St and Westlake Ave, immediately north of the federal courthouse
The project is a 27-story 500,000 square-foot administrative office building with 32,000 square feet of ground floor retail including a 12,000 square-foot child care center. Parking for 452 vehicles is provided below grade.

Developer: Touchstone Corp
Cost: $20,000,000
Neighborhood: Denny Triangle
Opening: 1Q 2009
DPD #: 3003439
Category: Office
Parking: 452

Back to topBack to top

Office/Residential

2201 Westlake/Enso
Completed : 2Q 2009
2201 Westlake Ave
9th Ave and Westlake Ave
The project consists of two towers. The north building is 11 stories and the south is 18 stories. The project includes 17,000 square feet of retail, 135 condominiums and 300,000 square feet of office space. The residential tower has been named Enso. The commercial tower is using the 2201 Westlake address as its title. This project has received LEED certification.

Developer: Vulcan Inc.
Cost: $150,000,000
Neighborhood: Denny Triangle
Opening: 2Q 2009
DPD #: 3003882
Category: Office/Residential
Units: 135

Back to topBack to top

Residential
Additional Residential units are in "Hotel/Residential" and "Office/Residential" categories.

420 Queen Anne Ave N
Currently Under Construction
420 Queen Anne Ave N
420 Queen Anne Ave N
A 6-story building containing 1,800 square feet of ground floor retail and 23 residential units on floors 2-5. Parking for 28 vehicles.

Developer: Queen Anne Partners LLC
Cost: $3,700,000
Neighborhood: Uptown
Opening: TBA
DPD #: 3003082
Category: Residential
Units: 23
Parking: 28
728 and 732 Boylston Ave E
Currently Under Construction
728 and 732 Boylston Ave E
728 and 732 Boylston Ave E
Three-story 13-unit townhouse with parking for 16 vehicles and three-unit townhouse with attached parking.

Developer: Prescott Homes
Cost: $1,200,000
Neighborhood: Capitol Hill
Opening: TBA
DPD #: 3005677 and 6143139
Category: Residential
Units: 13
Parking: 16
A.L. Humphrey House
Currently Under Construction
2630 1st Ave
East side of 1st Ave between Vine St and Cedar St
Seven story low-income apartment building with 84 units and 2,100 square feet of commercial space. SMR Architects is the project designer. The space is designed with a number of "green" elements to meet the state's Evergreen Sustainable Development Standard.

Developer: Plymouth Housing Group
Cost: $4,600,000
Neighborhood: Belltown
Opening: 2Q 2010
DPD #: 3007687
Category: Residential
Units: 84
Art Stable
Currently Under Construction
516 Yale Ave N
NW Corner of Republican St and Yale Ave N
Art Stable is a 7-story loft building designed by Tom Kundig with five floors of loft spaces and commercial space on Yale Avenue.

Developer:
Cost: $3,900,000
Neighborhood: South Lake Union
Opening: TBA
DPD #: 3009000
Category: Residential
Units: 5
Aspira
Completed : 3Q 2009
1823 Terry Ave
SW corner of Stewart St and Terry Ave
Keller CMS and Urban Partners are building a 34-story 323-unit apartment building on the former parking lot of the Gethsemane Lutheran Church. The church is considering creating 20 to 22 units of rental housing on the site for low-wage earners and perhaps some transitional housing for homeless people. The apartments will have two levels of underground parking with 90 stalls. Aspira will have 14,000 square feet of amenities, including a fitness room, spa, library and conference room.

Developer: Keller CMS and Urban Partners
Cost: $93,000,000
Neighborhood: Denny Triangle
Opening: 3Q 2009
DPD #: 3003807
Category: Residential
Units: 323
Parking: 90
Bakhita Gardens
Currently Under Construction
2301 2nd Ave
2nd Ave and Bell St
A six-story building with 50 residential units and a congregate residence for 40 residents, 2,500 square feet of retail at ground level and 3,500 square feet of office space. Parking for 6 vehicles will be provided below-grade.

Developer: Archdiocesan Housing Authority
Cost: $4,100,000
Neighborhood: Belltown
Opening: TBA
DPD #: 3006969
Category: Residential
Units: 50
Parking: 6
Broadway on Broadway
Currently Under Construction
1620 Broadway
Broadway Ave and Pine St
Sequoia Syndicate LLC is developing a mixed-use building next to Seattle Central Community College Bookstore. The project will include retail, office and residential components. Plans call for 13,400 square feet of street-level retail or a restaurant and 12,500 square feet of second-story office space. The residential portion of the building will include 122 units on six stories, with the main entrance on Nagle Place. Seattle Central plans to lease 24 of the units for student housing. The rest will be market-rate apartments ranging from 475 square foot studios to large two-bedroom units.

Developer: Sequoia Syndicate LLC
Cost: $19,400,000
Neighborhood: Capitol Hill
Opening: 1Q 2010
DPD #: 3006143
Category: Residential
Units: 122
Parking: 166
Canaday House
Currently Under Construction
424 Minor Ave N
Minor and Harrison
This project consists of 83 affordable housing units with services for homeless men and women living with mental illness. This project will include a library, computer labs, exercise facilities and common areas.

Developer: DESC and Building Changes (formerly AIDS Housing of Washington)
Cost: $16,500,000
Neighborhood: South Lake Union
Opening: TBA
DPD #: 3006922
Category: Residential
Units: 83
Escala
Completed : 3Q 2009
1918 4th Ave
SE corner of 4th Ave and Virginia St
This project is a 30-story building with 283 condominiums and will include 11,500 square feet of ground level retail, 25,000 square foot private club (Club Cielo) and six levels of underground parking for 600 vehicles. This project is seeking LEED certification.

Developer: Lexas
Cost: $350,000,000
Neighborhood: Retail Core
Opening: 3Q 2009
DPD #: 2403443
Category: Residential
Units: 283
Parking: 600
Frederic Oznan House
Completed : 2Q 2009
801 9th Ave
Columbia and 9th Ave
Frederic Ozanam House is a 56-unit project on First Hill. It was completed in 2009 and will serve chronically homeless men over 55 years of age, many of whom struggle with addiction, mental illness, and physical disability.

Developer: Archdiocese Housing Authority and Housing Resource Group
Cost: $11,000,000
Neighborhood: First Hill
Opening: 2Q 2009
DPD #: 3004316
Category: Residential
Units: 56
Parking: 14
Insignia
Planned, Permitted and Scheduled
2301 6th Ave
Whole Block between Battery St and Bell St, 5th Ave and 6th Ave
Two 32-story residential towers over an eight-story base structure; project includes 700 residential units and 34,200 square feet of retail space; parking for 1,063 vehicles to be provided in an above- and below-grade garage.

Developer: Embassy Development
Cost: $208,200,000
Neighborhood: Denny Triangle
Opening: TBA
DPD #: 3004231
Category: Residential
Units: 700
Parking: 1063
Joule Broadway
Currently Under Construction
523 Broadway E
West side of Broadway between Republican and Mercer
A Six-Story, 290-unit apartment building with 35,000 square-feet of street-level retail on one whole block. Parking for 400 vehicles will be included below grade.

Developer: Harvard Avenue Investments and Essex Property Trust
Cost: $57,400,000
Neighborhood: Capitol Hill
Opening: 2Q 2011
DPD #: 3004668
Category: Residential
Units: 290
Parking: 400
Marselle
Completed : 2Q 2009
115 Aurora Ave N
West side of Aurora between Denny Way and John St
A 7-story mixed use building containing 121 condominium units including 5 live-work units. Parking for 160 vehicles is provided below grade.

Developer: Marselle Partners / Sierra Construction
Cost: $19,600,000
Neighborhood: South Lake Union
Opening: 2Q 2009
DPD #: 3004853
Category: Residential
Units: 121
Parking: 160
Rollin Street Flats
Completed : 2Q 2009
120 Westlake Ave N
NE corner of Denny Way and Westlake Ave
This project has 203 open flats with creative, flexible spaces. Originally designed as condominiums, these apartments have 10-foot ceilings, floor to ceiling glass, air conditioning and many units include fireplaces. Units range from 700 to 2,000 square feet. Pursuing LEED certification.

Developer: Vulcan Inc.
Cost: $42,000,000
Neighborhood: South Lake Union
Opening: 2Q 2009
DPD #: 3003928
Category: Residential
Units: 203
Parking: 255
Seattle Cancer Care Alliance Patient Housing
Completed : 3Q 2009
1216 John St
NE corner of Pontius Ave N and John St
6-story structure, containing 80 residential units, 2,831 square feet of retail space at ground level and parking for 40 vehicles.

Developer: Seattle Cancer Care Alliance
Cost: $22,900,000
Neighborhood: South Lake Union
Opening: 3Q 2009
DPD #: 3004054
Category: Residential
Rooms: 80
Parking: 40
Skyline at First Hill
Completed : 1Q 2009
710 8th Ave
Full block between Eighth Ave and Cherry St
Greystone Communities completed a 26-story building with a nine-story health center on a full block. The 450,000 square-foot senior apartment project is above a 350-stall underground garage and have 199 independent living units. Residents have access to such services as assisted living, skilled nursing and memory support. The complex also includes a fitness center and pool, club room with an outdoor patio, auditorium, library, dining rooms, lounges, and an art studio.

Developer: Greystone Communities
Cost: $125,000,000
Neighborhood: First Hill
Opening: 1Q 2009
DPD #: 2407617
Category: Residential
Units: 199
Parking: 350
Taylor 28 and Denny Way Apartments
Completed : 2Q 2009
100 Taylor Ave N and 567 John Street
Taylor Ave N and Denny Way
This project features two 6-story buildings with 197 apartment homes including 5 live/work units and retail space. As part of this project, the historic Bank of America building at 566 Denny Way is being renovated and will be occupied by Walgreen's.

Developer: BRE Properties
Cost: $91,300,000
Neighborhood: South Lake Union
Opening: 2Q 2009
DPD #: 3006337 and 3006338
Category: Residential
Units: 197
Parking: 255
The Bart Harvey
Completed : 3Q 2009
430 Minor Ave N
430 Minor Ave N
32 Studios, 17 one-bedroom units and a manager-occupied one-bedroom unit. This senior housing complex has community spaces, a computer lab, as well as counseling and support services. Parking for 4 vehicles.

Developer: LIHI
Cost: $13,600,000
Neighborhood: South Lake Union
Opening: 3Q 2009
DPD #: 3005551
Category: Residential
Units: 50
Parking: 4
The Olivian
Completed : 2Q 2009
809 Olive Way
SE corner of 8th Ave and Olive Way
This project is a 27-story building with 7,000 square feet of ground-level retail and approximately 216 apartments with six levels of above-grade parking for approximately 358 vehicles.

Developer: Hanover Company
Cost: $40,000,000
Neighborhood: Denny Triangle
Opening: 2Q 2009
DPD #: 3003154
Category: Residential
Units: 216
Parking: 358
View 222
Completed : 3Q 2009
222 Queen Anne Ave N
222 Queen Anne Ave N
Thirty apartment units above 1,243 Square feet of street-level retail. Parking for 36 vehicles.

Developer: West Freeman Properties
Cost: $3,000,000
Neighborhood: Uptown
Opening: 3Q 2009
DPD #: 3005302
Category: Residential
Units: 30
Parking: 36

Back to topBack to top

Retail

1531 Melrose Ave
Currently Under Construction
1531 Melrose Ave
Melrose Ave and E Pine St
This project is a renovation of two adjacent buildings with about 22,000 square feet. The buildings will be divided into retail spaces ranging from 191 square feet to 6,468 square feet.

Developer: Eagle Rock Ventures LLC
Cost: $1,000,000
Neighborhood: Capitol Hill
Opening: TBA
DPD #: 3008113
Category: Retail
Century Square (renovation)
Currently Under Construction
1501 4th Ave
Between Pine/Pike and 3rd/4th
Gensler Architecture and Design created the plan to redesign the building's lobby. Includes improvements to elevator and escalator areas and a lobby upgrade. The project's final touches includes new exterior sidewalk canopies over existing retail storefronts, including the office tower entry on 4th Avenue.

Developer: Bentall Properties
Cost: $5,900,000
Neighborhood: Retail Core
Opening: TBA
DPD #: 6148296
Category: Retail
Hard Rock Cafe
Currently Under Construction
114 Pike St
N side of Pike between 1st and 2nd Ave
This is a renovation of the terra-cotta-clad Liberty Building, originally built in 1924. Once renovation is complete, the building will be occupied by a Hard Rock Cafe which will feature live music, a rooftop deck and a souvenir shop. Project is being built to LEED standards.

Developer: Urban Visions
Cost: $2,300,000
Neighborhood: Retail Core
Opening: 1Q 2010
DPD #: 6168375
Category: Retail
Pike Place Market Renovation
Currently Under Construction
1501 Pike Place
Pike Place Market
The Pike Place Market has started upgrades and improvements to the Market's infrastructure and features. Projects include new public restrooms, elevators and Hillclimb stairs as well as upgrades to heating, cooling, seismic, electrical and plumbing systems. The first phase is occuring along Western Avenue and involves installation of a new heating and cooling plant. $2 million is allocated for improvements to Victor Steinbruek Park.

Developer: Pike Place Market Preservation and Development Authority
Cost: $80,000,000
Neighborhood: Retail Core
Opening: 2Q 2010
DPD #: 6201700
Category: Retail
The Metropole Building (renovation)
Currently Under Construction
423 2nd Ave Ext S
SW corner of 2nd Ave Ext S and Yesler Way
This project is a reconstruction of all the interior spaces of the historic Metropole Building which were destroyed in a fire.

Developer: NBL II, LLC
Cost: $48,000,000
Neighborhood: Pioneer Square
Opening: TBA
DPD #: 6146798
Category: Retail

Back to topBack to top

Transportation

Capitol Hill Station Light Rail Transit Facility
Currently Under Construction
E Denny Way and Broadway Ave E
Broadway between E Denny Way and E John St
Sound Transit is building a station for Link Light Rail that will extend along the East side of Broadway from East John Street in the north to East Denny Way in the south. There will also be an entrance at 1827 Broadway. The station will provide passenger access to the 3.15 mile light rail tunnel which will run from the Pine Street stub tunnel under Capitol Hill to the University of Washington.

Developer: Sound Transit
Cost: $80,000,000
Neighborhood: Capitol Hill
Opening: 2016
DPD #: 3007888
Category: Transportation
King Street Station Restoration
Currently Under Construction
303 S King St
King St and Jackson St
The City of Seattle has resumed the restoration of King Street Station. In the first phase, the building is getting a new roof using green-colored tiles of the kind used when the building was first constructed. The second phase, beginning in 2009, will restore the original ceiling and the grand staircase linking South Jackson Street to the waiting room. The building will also be retrofitted with seismic improvements.

Developer: City of Seattle
Cost: $30,500,000
Neighborhood: Pioneer Square
Opening: 4Q 2011
Category: Transportation
Terminal 30 restoration
Completed : 2Q 2009
2715 E Marginal Way S
E Marginal Way S and S Lander St
In May 2009, the Port completed restoration of Terminal 30 to use as a container facility. This 35-acre facility served as a temporary cruise terminal from 2003-2008. The cruise terminal was demolished and six new cranes were erected as part of the renovation.

Developer: Port of Seattle
Cost: $31,000,000
Neighborhood: SoDo
Opening: 2Q 2009
DPD #: 3006903
Category: Transportation
Parking: 198

Back to topBack to top